Project Detail
BHP Billiton’s Groote Eylandt Manganese Company (GEMCO) extracts high-grade manganese ore that accounts for 15 percent of the world’s production. Faux Finishes was engaged to strip, reseal and the repaint the top of the fuel tanks in the tank farm the supports the mine and local community. Storing highly volatile fuels, including ULP, meant Faux Finishes’ intrinsically safe work methods and tools was able to complete these works without risk to people and property, whilst tanks remained filled.
The program of works comprised of:
- Hydro Blasting of surfaces to bare metal for preparation of resealing and repainting
- Patching of Damaged Areas
- Epoxy Sealing of Surfaces
- Intermediate Coats
- Poly Urathane Top Coats
Project
Groote Eylandt Tank Farm
Client
BHP Billiton
Lead Contractor
N/A
Project Value
N/A